![]() |
![]() |
|
iNEMI » cms » projects » ese » lead-free_rework_optimization.html
|
|
Projects
Pb-Free Rework Optimization Project Chair: Jasbir Bath (iNEMI Consultant)
The iNEMI Lead-Free Assembly & Rework Project found a need for development of lead-free area array rework capabilities and mini-pot rework processes. With thicker boards (93 to 135mil thick), it was difficult to rework the lead-free area array packages and create adequate holefill during mini-pot rework. Reliability testing found issues with reworked area-array and adjacent components. There is an urgent need to better develop the lead-free rework process in terms of improved rework equipment tolerances and repeatability, and to optimize/reduce heat transfer into boards to minimize component and board temperatures. Benefits of optimizing the Pb-free rework process include: · Understand and improve rework equipment tolerances and repeatability to reduce · Optimize/reduce heat transfer into boards, which will reduce reliability issues. · Reduce component temperatures during rework (which are already at or overthe limits set in the existing industry component rating standards for lead-free rework). · Better define and develop the mini-pot rework process so larger, thicker boards can be reworked instead of potentially scrapped. This project is focusing on: rework repeatability, mini-pot wave rework, FCBGA/BGA socket rework, and reliability testing. Statement of Work, v 3.1 (June 14, 2005) Lead-Free Rework Optimization Project, Jasbir Bath (Flextronics), iNEMI Lead-Free iNEMI Rework Machine Temperature Tolerance and Repeatability Study iNEMI Lead-Free Micro BGA, CBGA, Mictor Connector and Through-Hole PDIP Rework iNEMI Lead-Free SMT Area Array Rework Optimization Project Proposal |
| |