Active projects:
- Fiber Connector End-Face Inspection, Phase 2
End of Project Webinar, Phase 2 (March 23, 2009)
- Fiber Optic Splice Loss Measurement
- Optoelectronics for Substrates (joint with the Substrates TIG)
Completed projects:
- Fiber Connector End-Face Inspection, Phase 1
End of Project Webinar, January 24, 2007
- Fiber Optic Signal Performance
- Fiber Optic Splice Improvement
- Fiber Handling
Presentations
Fiber Connector End-Face Inspection Project and Optoelectronics TIG Meetings, OFC/NFOEC 2006 Conference, March 6, 2006, Anaheim, CA
Upcoming Meeting
iNEMI Optoelectronics TIG and Endface Specification Project Meeting at OFC/NFOEC 2008 (San Diego, California; February 25, 2008)