Projects
Chair: Zoe Conroy (Cisco)
End-of-Project Webinar, July 14, 2010, 1:00 p.m. EDT
Project background
At present, there are no standard chip-level interfaces or algorithms for built-in self-test (BIST), which is limiting introduction of this capability at board-level test. The goal of this new new initiative is to:
-
Develop and promote the adoption of chip BIST at the board/system level
-
Encourage IC vendors to provide standard chip BIST interfaces and algorithms.
-
Encourage ATE/instrument suppliers (board-level manufacturing) to adopt and develop products based on chip BIST.
Work will be implemented in three phases:
Phase 1 -- The first phase will survey the industry regarding current BIST capabilities and future requirements. The goal of this phase is to get industry feedback on board-level BIST that will assist in fine tuning the scope of Phase 2 of the project.
Phase 2 -- The current vision is that the second phase will include the following:
- Identify chip BIST technologies that can be migrated to run at board/system-level test.
- Investigate BIST tests that enable PCBA testing without (or with only minimal use of) fixture/ICT (in-circuit test), currently the typical manufacturing test approach. The objective is to lower the cost of test and enhance test coverage for high-speed interconnects.
- Promote extension of existing related standards to include BIST design.
Phase 3 -- The third phase will develop guidelines and recommendations for a new standard for PCBAs to run BIST tests, and transfer these recommendations to the appropriate standards body for implementation. (Phase 3 will take place only if it is a recommended outcome of Phase 2.)
Steps for joining the project On October 9, 2009, the iNEMI Technical Committee approved the SOW and Project Statement, thus beginning the corporate sign-up period for this project. The project will officially begin as soon as two iNEMI members sign the project statement. The period for becoming a founding member for this project will close on November 11, 2009.
For iNEMI members:
- Complete and sign the project statement
- Fax the completed statement(s) to +1 (703) 834-2735 or scan and email to infohelp@inemi.org
For non-members:
Statement of Work and Project Statement (PDF files)
Statement of Work (Version 1.5, October 12, 2009)
Project Statement (Version 1.5, October 12, 2009 (initial sign up ended November 18, 2009)
For additional information: Haley Fu +86 21 5835 3839 haley.fu@inemi.org
|